The pictures below see next post are how the contractor left the work.
Patching concrete floor after rough plumbing.
This is part of a bathroom remodeling project.
The temperature of the existing concrete must remain above 50 degrees for the first 24 to 48 hours after the patch is applied.
The cooler the weather the longer the curing time.
How to repair a hole in the floor of a slab foundation.
How to cut a concrete floor for new plumbing.
Vinyl concrete patch repair quikrete 40 lb.
How to repair a hole in concrete floor in this video renos does a floor repair on a concrete floor.
Just prior to the contractor ending work his plumbing and electrical subs had passed their rough inspections then his demo guy covered up the work in preparation for patching the slab.
Vinyl concrete patcher is ideal for making smooth repairs to crack or chipped concrete floors sidewalks or steps.
Many remodel projects in homes with a concrete foundation and slab call for moving plumbing fixtures such as toilets sinks and floor drains.
Well the contractor walked mid job so i ll be gc ing after all.
For a texture pull a damp push broom over the concrete.
During new construction the builder installs drain lines and stubs that will connect to future plumbing fixtures before he pours the slab on grade.