Rafter or roof truss to top plate table and section 2308 7 5 3 10 common 316d box 410d box 43 x0 131 nails 4 3 14 gage staples 7 16 crown toenail c 7.
Nail pattern for roofing felt.
Overhang is not required.
Roll out about 10 feet of felt and fasten with staples or roofing nails with plastic washer heads.
The paper should then be nailed in or stapled every three to four inches across.
Bsd 321 handout fastening schedule.
Contact roofhelp 12 24 nailing pattern for roofing felt each row of nails that are 24 on center should be approximately 12 from the outside edge of the roll.
The top edge of the felt should be nailed no less than every eight inches.
Check at several points to make sure the overhang is consistent.
The overhang to the next strip should be 3 8 inch.
The wsu should overhang the drip edge by 1 2 inch so snap a line that is 35 1 2 inches above the drip edge.
Use a construction stapler or a hammer.
Put fasteners at least every 8 inches.
Where a roll ends and a new one is begun the two rolls should be overlapped by four inches.
Snap a chalkline to help you align the wsu or felt.
Roof rafters to ridge valley 2 16d common end nail.
All nails and staples should be placed on the lower half of the paper.